ADVISORY NOTES

  • AN25 - Machinery directive Advisory Note
  • AN26 - ADVISORY NOTE ON COMBINED PENETRATION SEALS
  • TGD 21 Revision of CE UKCA advisory note
  • AN24 - Yellow Book default temp justification
  • AN19 Elevated Temps june 2021
  • AN23 Secondary steelwork
  • position on Compatibility between Pipes & Seals
  • AN21 Coatback - Unprotected Secondary beams
  • AN20 ASFP position on Portal Frame Buildings
  • AN18 ASFP Position on Installing Partitioning
  • AN17 ASFP position on Assessments and Technical Evaluations in Lieu of Fire Testing
  • ASFP position on the Interchangeability of Supporting Construction for Firestopping
  • Statement on expiration of Yellow Book 4th Edition Certification
  • Position on Coating of Cellular Beams
  • Best Practice in the Specification of Intumescent Coatings
  • Position on CE Marking of Intumescent Coatings
  • Position on Partial Penetrations
  • Framing out of partitions
  • Selection of Fire Seal Materials to Amend or Refurbish Existing Non-Reusable Service Penetration
  • Issues surrounding service support centres
  • Horizontal linear gap seals used in curtain walling systems
  • Use of firestopping components from different manufacturers/systems
  • Yellow Book tables 18 & 19 and cell beams
  • Safe use of horizontal fire stopping
  • Fire liability and you
  • Test and Assesssment Procedures for Circular Solid Rods Protected with Intumescent Coatings
  • Indicative or Ad-hoc Testing
  • Competent Person
  • PU Foam
  • Combustible 40 mm pipes
  • Awareness Guidance
  • Specifying Steelwork Fire Protection